变宽箱梁预应力配束方式优化分析论文_纪海龙,苗超

安徽省交通规划设计研究总院股份有限公司 安徽合肥 230088

摘要:常规预应力砼现浇箱梁腹板束张拉方式对桥梁施工顺序有一定要求,不利于多向开展施工作业,目前,很多在建项目对工期要求非常紧张,多作业面开展施工方式变得尤为重要,本文以在建项目为例,对箱梁腹板预应力配束方式进行了优化设计,对同类结构设计起到一定的参考作用。

关键词:现浇箱梁;腹板束;张拉方式;优化设计

Optimization Analysis of Reinforcement Method for PrestressedRebar in non-uniform Width Box-beam

Ji Hailong1 Miao Chao1

(1 Anhui Transport Consulting & Design Institute Co.,Ltd)

Abstract: The traditional tensioning method for prestressed rebar in the web plate of cast-in-suit prestressed concrete box girder has many requests on construction sequence, and it is not conducive to carry out the omnibearing construction work, at present, the requirement of time of many projects under construction is very short, and it makes the way of more operation to carry out the construction more important. take a project in progress as an example in this paper, optimization design was carried on about reinforcement method for prestressed rebar in the box-beam web plate, and it can play a role of reference in the similar structure design。

Key words:Cast-in- suit Box Girder,Webe Steel beam,Tension Method,OptimizationDesign

1、概述

随着我国经济建设快速发展,不断加大基础建设的投入力度,桥梁建设在我国得到了蓬勃发展,基础建设促进“一带一路”、“长江经济带”等一系列国家战略实施。预应力砼现浇箱梁以其受力良好、经济、施工便利等优点得到广泛应用,然而在大规模施工中,多向工作面的开展对工程进度影响极大,传统现浇箱梁腹板束在梁端张拉并锚固,现场施工时最多开展两工作面,因此,优化腹板配束方式显得至关重要。

2、项目概况

以孔径330m为例,采用单箱双室直腹板等高截面,桥宽16.74~17.84m,梁高2.0m,顶板厚0.28m,底板厚25cm,腹板厚50cm,端隔梁1.2m,中隔梁1.5m。

为避免相邻梁体预应力张拉干扰,腹板束上弯至顶板张拉,顶、底板束在箱内张拉,考虑横梁钢筋较密,避免施工割断数量过多,顶板张拉槽口应靠近梁端设置。该配束方式优点为张拉不受施工顺序、空间限制,对于工期要求紧张、规模较大梁桥施工有利,可提高施工进度。

3.2.2持久状况正常使用极限状态验算

钢筋混凝土构件,短期效应并考虑长期效应影响,最大裂缝宽度出现在悬臂根部上缘,宽度。

4、结语

经过计算分析可知,桥梁整体受力满足规范要求,横梁受力均满足规范要求,该配束方式即满足结构受力要求,又方便现场施工,提高施工进度,为今后同类结构设计起到一定的参考作用。

参考文献

[1]JTGD60-2015.公路桥涵设计通用规范[S].人民交通出版社,2015

[2]JTGD62-2004.钢筋混凝土及预应力混凝土桥涵设计规范[S].人民交通出版社,2004

[3]谢宝来曹景.箱梁横梁的计算剖析[J].城市道桥与防洪2007(12)

论文作者:纪海龙,苗超

论文发表刊物:《建筑学研究前沿》2017年第27期

论文发表时间:2018/2/26

标签:;  ;  ;  ;  ;  ;  ;  ;  

变宽箱梁预应力配束方式优化分析论文_纪海龙,苗超
下载Doc文档

猜你喜欢